Cast Iron Melting Furnace

Cast Iron Melting Furnace Features 1. Line frequency core induction furnace(125kw) for smelting cast steel, cast iron, stainless steel, copper, aluminum and other metals or its alloy. 2. Convenient to change induction coil or crucible. 3. Set up over voltage, over current and water deficient...
Chat Now

Product Details

Cast Iron Melting Furnace Features

1. Line frequency core induction furnace(125kw) for smelting cast steel, cast iron, stainless steel, copper, aluminum and other metals or its alloy.

2. Convenient to change induction coil or crucible.

3. Set up over voltage, over current and water deficient protector, and run safely.

4. Highly integrated in controlling circuit, free of use of high-rate starter and relay loop, fairly low failure rate.

5. Lower in power consumption (75% lower than old ones).

6. Manual tilting method.

7. Low cost mini smelter 20kg iron scrap melting furnace for sand casting.


Technical Parameters

Rated Furnace : 1 t

Total Capacity : 1.2t

Rated Power : 125kw

Rated Voltage : 380v

Voltage Range : 90-380v

Power Factor After Compensating : 0. 97CosO

Melting Range (Brass) : 420kg/h

Power Of Blower : 2.2kw

Net Weight Of Furnace : ~5t

Electric Control Cabinet : 16000*600*2000mm

Size Of Appearance Of Furnace : 2000*1550*85 mm


For more technical details, pictures and video please contact us !


Machine Work Diagram

image001.jpg


Production Workshop

内页专用 : 图1.jpg


Melting Materials

image003.jpg


Our Services

Sales Service: Inquiry and consulting support. Training how to install the cast iron melting furnace, training how to use the casting smelting furnace. Engineers available to service machinery overseas.We are not short-term business, what we need is a long-term cooperation.


Quality Guarantee : One year guarantee. During the guarantee period, we are guarantee to solve all problems may occur due to the induction melting furnace's quality or wrong design.

Payment Terms: 30% as deposit, 70% after the melting furnace are ready before delivery;

Delivery Time : Generally it is 5-10 days if the goods are in stock. or it is 20-30 days if the goods are not in stock, it is according to quantity.

Packaging & Shipping
1.Outside package: Standard export wooden cases;
2.Inner package: Stretch film;
Shipping: Container transport.


image005.jpg


Inquiry